Repairs to lift station should be completed by our electrician tomorrow 12/19.  However, we have been advised that it may be 12/28 before TECO can install the new meter.  The lift station will continue to be powered by the generator until meter is installed and service vendor has switched the power supply.  If we have any new updates before 12/28, they will be posted.