As you may have noticed, the repaired gate has been installed. Further testing with the control box is required to insure proper operation so expect to see the gate being tested during the first part of the week with full operation resuming on or before Friday, February 8th, 2019.
Please remember to drive carefully and honor the posted speed limits and traffic signs.